5. Maintenance

5.1 General notes

Careful maintenance:
ð increased service life
ð increased function
ð reduced downtimes
ð increased reliability
ð reduced repair costs
Observe the safety regulations!
Maintenance works should only be carried out when the
engine is shut off.
The engine and machine should be cleaned thorougly be-
fore carrying out maintenance work.
Park the machine on a flat surface and secure it against
rolling away and slipping.
Ensure that operating materials and replaced parts are
disposed of safely and in an environmentally - friendly
way.
Before commencing work on any electrical equipment,
disconnect the battery and cover it with insulating mate-
rials.
Works
Clean machine
1)
Check engine oil level
1)
Change engine oil
1)
Check the water trap
1)
Clean engine oil filter
1)
Clean fuel filter
1)
Change fuel filter
1)
Check air filter
2)
Change air filter element
1)
Check valve clearance
Exciter: Check oil level
2)
Exciter: Change oil
Check hydraulic oil level
Change hydraulic oil
Check the hydraulic hose lines
Check rubber buffers
Check V-belt
Check screwed connections for tight-
ness
1)
See engine operating manual
2)
Minimum once a year
3)
For the first time
5.2 Maintenance schedule (HATZ = À / Honda = ˜)
Intervals
Daily
20 h
À˜
À˜
À˜
À
À
À˜
À˜
À˜
2)
À˜
Do not confuse «PLUS» and «MINUS» poles on the bat-
tery.
It is essential that short-circuits be prevented in cables
carrying current.
Burn-out lightbulbs in indicator lamps should be re-
placed immediately.
When cleaning the machine with a high-pressure water
jet, do not spray the electrical components directly.
After washing the components, blow-dry them with com-
pressed air in order to prevent surface leakage current
and corrosion.
When carrying out welding work on the engine or ma-
chine,earth the welding instrument as close as possible
to the welding point and disconnect the battery.
50 h
100 h
˜
3)
3)
˜
3)
À˜
À˜
3)
À˜
À˜
À˜
À˜
3)
35
200 h
250 h
400 h
À
À
À
À
À
À˜
If neces-
sary
(À˜)
À˜

Quicklinks ausblenden: