Caution
The ceiling unit includes some components common to the "left-side" and "right-side" subassemblies.
During assembly, the bolt-inserting direction for one subassembly should be opposite to that for the other so that
the nuts are located inside when the Plasma Display is installed. (Bolts should be inserted from the label side of the
column .)
(In this manual, the procedures of assembling the "right-side" subassembly when viewed from the front of the
Plasma Display are shown in the figures below.)
Preparation of components
Preparation of M16 bolts (80 mm)
(Vertical hanging: 10 sets / Inclined hanging: 14 sets)
Install one plain washer and one collar in that order, on each M16 bolt (80 mm) .
Preparation of M8 bolts (60 mm) (22 sets)
Install one spring washer and one plain washer in that order, on each M8 bolt (60
mm) .
Preparation of plates
As shown in the right figure, prepare 6 sets of plates and bolts.
1. Insert insulating collars into the protective collar , and put
them between plates.
2. Pass one prepared M16 bolt through, and finally fasten in
place with the nut.
• The bolt should be securely tightened to the torque given
below.
25~35 N•m
Preparation of base
As shown in the right figure, prepare 2 sets of base and bolts.
1. Insert insulating collars into the protective collar .
2. Put the protective collar between the side plates of the base
.
3. While holding the collars, pass one prepared M16 bolt
through.
4. Fit washers on the bolt, and fasten in place with the nut.
• The bolt should be securely tightened to the torque given
below.
25~35 N•m
Preparation of columns (L/R)
As shown in the right figure, prepare 2 sets to attach the gaskets
on the columns (L/R) .
Attach the three gaskets to the same surfaces of the two
columns on which the parts number stickers are displayed.
• Attach the gaskets at the positions shown in the figure.
Prepared
1
M16 bolt
2
1
2
4
Prepared M16 bolt
Parts number stickers
3
17