Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - BWT Rondomat Duo-DVGW 2 Einbau- Und Bedienungsanleitung

Duplex enthär x enthärtungsanlagen
Vorschau ausblenden Andere Handbücher für Rondomat Duo-DVGW 2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3

Installation

Installation
Installation
Installation
Installation
By the operator of the unit
Fit shut-off valves up- and downstream of the unit. The unit can be connected
to the water-supply network with commercially available fittings and stop
valves.
We recommend that you connect the unit using flexible hoses, e.g. with the
connection set. Softening units with more than 90 litres of resin per bottle
must have flexible,
must have flexible,
must have flexible, i.e. not rigid, piping.
must have flexible,
must have flexible,
An E multiblock module can only be installed on Rondomat Duo 2 and 3
models if blended water is to be used (not at a residual hardness of
< 0.1 °d).
< 0.1 °d)
< 0.1 °d)
< 0.1 °d)
< 0.1 °d)
If the residual hardness is less than 0.1° d, a GIT multiblock module can be
used.
Please note that there is a separate manual for the E Multiblock/GIT Module
and for connection set DN 32/32.
The univalve block 1
1
/
" order no.: 11822 can also be used for Rondomat
2
6 models.
Note: Be sure to observe the arrows on the control valve that indicate the
Note: Be sure to observe the arrows on the control valve that indicate the
Note: Be sure to observe the arrows on the control valve that indicate the
Note: Be sure to observe the arrows on the control valve that indicate the
Note: Be sure to observe the arrows on the control valve that indicate the
direction of flo
direction of flow w w w w .
direction of flo
direction of flo
direction of flo
Units 6 and 10 only
Units 6 and 10 only
Units 6 and 10 only
Units 6 and 10 only
Units 6 and 10 only
Units 6 and 10 are delivered empty and in unassembled form.
1. Position softening columns (1+2
tion diagram), and remove the central pipes. Note!
central pipes! The length of the central pipe with the distributor is
designed precisely for the softening columns.
Make sure that the softening columns are empty and clean.
2. The distributor at the lower end of the central pipe has a recess.
There is a mortice at the bottom of the softener column. Place the
central column with the distributor nozzle downwards on the mortice
in the softener column. The mortice secures the distributor of the
central pipe. Seal the pipes using protective caps.
Note! During filling no chips may fall under the distributor nozzle.
Note! During filling no chips may fall under the distributor nozzle.
Note! During filling no chips may fall under the distributor nozzle.
Note! During filling no chips may fall under the distributor nozzle.
Note! During filling no chips may fall under the distributor nozzle.
The control valve could break while it is being screwed on.
The control valve could break while it is being screwed on.
The control valve could break while it is being screwed on.
The control valve could break while it is being screwed on.
The control valve could break while it is being screwed on.
3. Put the filling cone in place and pour in the correct quantity of coarse
chip, followed by fine chip and resin, making sure that they are evenly
distributed around the central pipe. Flush in the last 1 - 2 sacks of ion
exchanger with a disinfectant solution.
Disinfectant solution preparation:
6 g Certisil powder for 10 liters of water
6 g Certisil powder for 10 liters of water
6 g Certisil powder for 10 liters of water
6 g Certisil powder for 10 liters of water
6 g Certisil powder for 10 liters of water
Safety note!
Safety note!
Safety note!
Safety note! Wear disposable gloves when preparing and flushing.
Safety note!
Filling quantity per softening column
Filling quantity per softening column
Filling quantity per softening column
Filling quantity per softening column
Filling quantity per softening column
Model
Model
Model
Model
Model
Coarse
Coarse
Coarse
Coarse
Coarse
Fine chip
Fine chip
Fine chip
Fine chip
Fine chip
chip
chip
chip
chip
chip
6 6 6 6 6
1 bag
1 bag
= 10 l
= 4 l
10
10
10
10
10
1 bag
1 bag
= 10 l
= 7 l
Water meter
Water meter
Water meter
Water meter
Water meter
12+13
12+13
12+13
12+13
12+13
14+15
14+15
14+15
14+15
14+15
Fig. 1a
(not at a residual hardness of
(not at a residual hardness of
(not at a residual hardness of
(not at a residual hardness of
1+2
1+2) in a suitable location (see installa-
1+2
1+2
Note!
Note! Do not mix up
Note!
Note!
Resin
Resin
Resin
Resin
Resin
Desinf.
Desinf.
Desinf.
Desinf.
Desinf.
solution
solution
solution
solution
solution
4 sacks
approx. 40 l
= 100 l
6 sacks
approx. 50 l
= 150 l
Mounting plate for Soft-Control screwed
Mounting plate for Soft-Control screwed
Mounting plate for Soft-Control screwed
Mounting plate for Soft-Control screwed
Mounting plate for Soft-Control screwed
down here
down here
down here
down here
down here
Refill disinfectant solution until it is approx. 2 cm above the resin.
The disinfectant solution must remain in the softening column for 1
The disinfectant solution must remain in the softening column for 1
The disinfectant solution must remain in the softening column for 1
The disinfectant solution must remain in the softening column for 1
The disinfectant solution must remain in the softening column for 1
hour. The unit may not be started for at least one hour after filling.
hour. The unit may not be started for at least one hour after filling.
hour. The unit may not be started for at least one hour after filling.
hour. The unit may not be started for at least one hour after filling.
hour. The unit may not be started for at least one hour after filling.
4. Clean softening column upper sections and threads of resin.
Remove the protective caps from the middle pipes. Do not pull the
Remove the protective caps from the middle pipes. Do not pull the
Remove the protective caps from the middle pipes. Do not pull the
Remove the protective caps from the middle pipes. Do not pull the
Remove the protective caps from the middle pipes. Do not pull the
pipes upwards.
pipes upwards.
pipes upwards.
pipes upwards.
pipes upwards.
5. Smear O-rings with high-quality grease (e.g. Vaseline), and screw
the control valve (3 3 3 3 3 ) and the adapter (4 4 4 4 4 ) on the softening columns,
ensuring a tight fit. The central pipes must engage in the openings
sealed by the O-rings on the control valve and adapter respectively.
Turn the softening column into the connecting position. Pull the O-rings
onto the reinforced hoses (17
17
17
17). Insert the reinforced hoses into the
17
control valve and adapter and secure each one with two support clamps
(18
18
18).
18
18
Secure the controller mounting-plate
Unscrew two screws on the control valve (see below) and secure the
mounting plate using these screws. Screw the Soft-Control controller
and the transformer onto the mounting plate.
Connect the unit to the local water-supply network
Connect the unit to the local water-supply network
Connect the unit to the local water-supply network
Connect the unit to the local water-supply network
Connect the unit to the local water-supply network
The local hard and soft water pipes should be connected to the input and
output pipes on the unit respectively.
Insert the brine hose (9 9 9 9 9 ) into the tapered opening of the brine hose
connection (16
16) and tighten the coupling ring.
16
16
16
Secure the flushing-water hose (16 x 3) to the flushing-water connec-
tion (10
10
10
10
10) using hose clamps. Route the hose with a natural incline to the
sewage system connection and secure against sudden pressure-in-
duced movement.
Note!
Note!
Note!
Note!
Note!
If the flushing-water hose is routed above the total height of the unit
(max. 1.5 m), the admission pressure on the injector must be reset by
our after sales service staff when the unit is started.
Fasten a hose (13 x 2) around the overflow (8 8 8 8 8 ) of the brine container.
Secure it with hose clamps and route it with an incline to the sewage
system connection (drain). There should be no constriction of the cross
section of either hose.
Please note:
Please note: According to DIN 1988, the flushing water and overflow
Please note:
Please note:
Please note:
hoses must be routed separately and connected to the sewage water
system at least 20 mm above the highest waste water level (unimpeded
drainage).
Make electrical connections (see terminal connection diagram; 8-wire
valve block, numbered cables; salt low, water meter, transformer).
Note:
Note:
Note: The po
Note:
Note:
The pow w w w w er supply unit f
The po
The po
The po
er supply unit f
er supply unit f
er supply unit f
er supply unit for the control v
or the control valv
or the control v
or the control v
or the control v
cording to EN 60335-1.
cording to EN 60335-1.
cording to EN 60335-1. The complete po
The complete po
The complete po
The complete pow w w w w er supply unit m
cording to EN 60335-1.
cording to EN 60335-1.
The complete po
placed in event of damage to the mains cable.
placed in event of damage to the mains cable.
placed in event of damage to the mains cable.
placed in event of damage to the mains cable.
placed in event of damage to the mains cable.
4 1
3 2
GB
GB
GB
GB
GB
alve is constr
alv
alv
alv
e is constructed ac-
e is constr
e is constr
e is constr
ucted ac-
ucted ac-
ucted ac-
ucted ac-
er supply unit m
er supply unit must be re-
er supply unit m
ust be re-
ust be re-
ust be re-
er supply unit m
ust be re-
16
16
16
16
16
Solenoid
Solenoid
Solenoid
Solenoid
Solenoid
valves
valves
valves
valves
valves
10
10
10
10
10
25
25
25
25
25

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis