Transportation
1. During transportation and installation of the unit, safety gloves should always be worn
and should beware of the damage from sharp edges.
2. The transport process should be done with at least one assistant, and during the
transport, protective gloves have to been worn for protecting from sharp edges.
3. If the transport will be made in a crawler, a vehicle with an appropriate lifting and
carrying capacity should be preferred.
4. Before and during the transport, the units must be properly fixed and protected
against falling and tumbling.
Storage
1. If the unit will be stored, it must be protected from external environment conditions.
They should not be placed on wet grounds.
2. The temperature of the closed storing areas should be between -10˚C and 60˚C.
3. Until the date to use the unit, it should be stored in its original conditions and should
not be removed from the box or package.
Installation
1. During the installation of ceiling concealed fan coil unit, it's very important that
protective helmet and footwear are worn.
2. It is necessary to be cautious about falling pieces and sharp edges that could give
damage.
3. During the installation, make sure that there aren't any missing and damaged parts
and not damaged during transport.
4. Lost and damaged parts should be reported and the information about these parts
must be provided to the relevant persons.