Herunterladen Inhalt Inhalt Diese Seite drucken

Eaton 9910-E83 Installationsanleitung Seite 75

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Follow the instructions included with the Relay/Serial Card and Cable Kit
to install the card and set UPS monitoring functions in i5/OS
(TTY) server. Installation may include removal of an existing X-Slot card
from the UPS.
Follow the software installation instructions contained on the Software
Suite CD to install the LanSafe software.
If you have an i5, connect the cables as shown in Figure 36. Otherwise,
see Figure 37 to connect the cables.
Serial (TTY)
Server
Serial Interface Cable
(labeled 124102044-001)
UPS
®
Eaton
9140 (9910-E82/E83) UPS Installation Guide for IBM
IBM i5 Server
"P1-T1" UPS Port
Relay/Serial Card
Communication Port
Figure 36. i5 and Serial Server Interface
®
Applications
COMMUNICATION
®
UPS Interface Cable (labeled 1827)
AS/400 Interface Cable
(labeled 152601976-001)
S
164201715 Rev 2
www.eaton.com/ibm
and serial
59

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

9910-e829140

Inhaltsverzeichnis