Herunterladen Inhalt Inhalt Diese Seite drucken

Accessories - Truma SecuMotion Gebrauchsanweisung Und Einbauanweisung

Vorschau ausblenden Andere Handbücher für SecuMotion:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Gas-flow monitor
function test
The functionality of the gas-flow
monitor is directly related to how
the gas pipe was installed. For
this reason, it must be checked
individually for every type of
vehicle. This test is therefore a
permanent part of the design
procedure! We also recommend
a function test as part of series
production in order to counter-
act negative effects caused by
any changes to the installation
procedure.
– Open all stop valves.
– Unscrew the first heating unit
from the line and seal off the
line temporarily.
– Bring the gas system into
operation (see "Operating
instructions").
18
– Open the temporary seal. Gas
may flow out for only a short
time until the gas-flow monitor
is triggered.
– Screw the heating unit to the
gas line.
– If you have more than one
heating unit, you must
perform the test separately for
each one!
– Conduct the leak test (see
"Checking the low pressure
area for leaks").

Accessories

High pressure hoses
(with hose rupture protection
device) see page 68 – 69
1.5 meter connection hose
for the connection of external
gas cylinders
– connection G.5 for Germany –
(part no. 50020-61300)
Replacement gasket
for high-pressure connection,
M20 x 1.5 (G.13);
(part no. 50020-76300)
DuoComfort
Changeover valve for the
two-cylinder system
(part no. 51500-01)
EisEx regulator heating
(part no. 53101-01)
Angle union 90°
(part no. 50020-56000)

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis