Herunterladen Inhalt Inhalt Diese Seite drucken

Important Assembly Instructions; Installation Of The Tubular Motor; Mounting The Bearing (Figure ); Determine The Length Of The Rotating Union (Figure ) - RADEMACHER RolloTube I-line Funk Small Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für RolloTube I-line Funk Small:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Important assembly instructions

IMPORTANT
◆ Check that the voltage / frequency on the type plate corresponds to local mains
conditions prior to installation.
◆ All cables and equipment not required for operation of the equipment is to be removed
or deactivated prior to installation of the tubular motor.
◆ Moving drive parts to be operated at a height under 2.5 m from the floor must be
protected.
◆ If the tubular motor is to be controlled with a switch with a default OFF setting, then
the switch is to be positioned in the line of sight of the tubular motor and at a height
of at least 1.5 m.
◆ The cover of the roller shutter box must be freely accessible and removable.
◆ Never dismantle the stopper from the final roller shutter lamella.
Otherwise the roller shutters may slip through into the roller shutter box and be
damaged.
CAUTION

Installation of the tubular motor

NOTE
The following installation instructions apply to standard installation situations in combination
with RADEMACHER tubular motors and accessories.
The drive head (12) of the motor can be installed on either the right or left sides of
the roller shutter box. These instructions depict the installation on the right-hand side.
Mounting the bearing (Figure
Check that the bearing is installed horizontally. Roller shutters wound
at an angle can block the drive and cause damage.
1.
First determine the position of the drive (13) and counter bearing (1)
in the roller shutter box.
Wind the roller shutter casing fully onto the rotating union and measure diameter D. See
figure
in order to determine the position of the centre of the bearing to the guide rail.
Determine the length of the rotating union (Figure
B
B = Counter bearing / Bearing capsule
C = Drive end bearing / motor
36
36
)
C
Installing the tubular motor at an angle can cause the tubular motor or
roller shutters to be damaged. For example, roller shutters wound at
an angle can block the drive and cause damage.
◆ Always ensure that the tubular motors and bearings are mounted
horizontally.
◆ Please ensure that the rotating union (5) and the roller shutters
(17) can move down easily and freely after installation is complete.
◆ The roller shutters (17) may not run over the bearing, the bearing capsule (4) or
the drive head (12) during operation.
◆ Ensure that the rotating union (5) and the fastening springs (6) of the drive (9) do
not touch. They may not rub against the tubular motor (9) during operation.
For automatically actuated awnings:
◆ A minimum gap of 0.4 m to other parts in the area must be maintained when the
awning is fully extended.
◆ Awnings used in an awning system must maintain a minimum height of 1.8 m.
Required minimum width for the roller shutter box:
Tubular motor type:
Minimum width approx.:
1.
IMPORTANT
When installed, the wound roller shutter must run vertically in the guide rails on the window.
2.
Fasten the bearing in accordance with the bearing type and on-site
conditions.
Mount the drive bearing (13) so that the set button (11) will be easily accessible and
the motor cable can be laid without kinking.
)
1.
Measure the wall gap of the drive bearing (13) and counter bearing
(1) as shown.
2.
Measure the roller shutter box and calculate the required shaft length
(L).
Length of the rotating union: L = A - (B + C)
3.
Shorten the rotating union (5) to the required size.
Cut the shaft to size with a hacksaw at a right-angle. Remove the burrs from the shaft
internally and externally with a file.
ILFS ...
ILFM ...
56 cm
67 cm
EN
EN

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis