Herunterladen Inhalt Inhalt Diese Seite drucken

Moving The Appliance - Haier HW80-B14266A-EC Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
Preparation
Remove all packaging material including polystyrene base.
While opening the package, water drops may be seen on
plastic bag and porthole.This normal phenomenon results
from water tests in the factory.
Dispose of the packaging in an environmentally
friendly manner. For information refering current
disposal routes, consult your retailer or the local
authorities.
Dismantle the transportation bolts
The transportation bolts are designed for clamping anti-
vibration components inside the appliance during trans-
portation to prevent inner damage.
1. Remove bolts on the rear side and take out
from inner side of the machine.
spacers (A)
General information and tips:
Keep the transportation bolts in a safe place for later
use.Whenever the appliance is to be moved at first
reinstall the bolts.
2. Replace back cover by inserting it in the two gaps its
convexity is facing out.

Moving the appliance

If the machine is to be moved to a distant location, replace
the transportation bolts removed before installation to
prevent damage.
1.
Remove the blanking plugs.
2.
Insert the plastic spacers and the transportation bolts.
3.
Tighten the bolts with a spanner.
plastic
23
1
2.

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis