Herunterladen Inhalt Inhalt Diese Seite drucken

Klarstein 10031084 Anleitung Seite 14

Deckenventilator
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Loosen 2 screws at the yoke of the
motor assembly. Slide the canopy
into the downrod. Thread the
power leads from the fan through
the canopy, decorative cover and
downrod (take extra care not to pull
power wires damage). Set downrod
into yoke and rotate until the holes
match. Then, insert lock pin through
4
the holes and firm it with R pin.
Tighten 2 screws and nuts at the top
yoke of the motor assembly.
ATTENTION: Make sure the R pin
and lock pin is proper and secure
to prevent the fan from falling
or causing property damages or
personal injury.
When mounting the fan, ensure that
the safety wire is looped across the
mounting bracket. Tighten the two
downrod set screws to make sure the
fan run stably. Then, install
downrod (ball part) into mounting
5
bracket opening that already securely
fastened to a structural ceiling
member. The tab opposite of the
mounting bracket opening should fit
in slot on ball.
Insert the receiver into the mounting
bracket (see „Remote Control and
Receiver"). Loosen the screws from
the mounting bracket, uphold the
canopy to cover the mounting
6
bracket, then let the mounted hole
aim at the screws, then firm the
screws. ATTENTION: Make sure all
wires are proper connected.
14

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis