Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Typical Installations; Vented (Open) Installation - clage MBH 6 Gebrauchs- Und Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Installation

3. Installation
Installation, initial operation and maintenance of this appliance must only be con-
ducted by an authorised professional, who will then be responsible for adherence to
applicable standards and installation regulations. We assume no liability for any damag-
es caused by failure to observe these instructions!

3.1 Typical installations

3.1.1 Vented (open) installation

Electrical connection with
mains power cable
(shorten if necessary)
Fig. 3: "Vented (open) installation with a special open-outlet tap" (dimensions in mm)
Insert the special tap aerator:
3,5 / 4,4 kW: CSP 3
5,7 / 6,5 kW: CSP 6
Angle valve outlet G ⅜"
23
EN

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Mbh 3Mbh 7Mbh 4

Inhaltsverzeichnis