Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Blocking The Elevating Assembly; Scissor Brace Installation; Scissor Brace Storage - Upright MX15 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für MX15:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

M
AINTENANCE
!
W A R N I N G
Never perform service while the platform is elevated without first blocking the elevating assembly.
DO NOT stand in the elevating assembly area while deploying or storing the brace.
B
L O C K I N G
A
S S E M B L Y
S
CISSOR
1. Park the work platform on a firm, level surface. Com-
pletely unload the platform before installing the Scis-
sor Brace.
2. Verify that the Chassis and Platform Emergency
Stop Switches are ON by pulling each button out.
3. Turn and hold the Chassis Key Switch to
4. Push the Chassis Lift/Lower Switch to
vate the platform approximately 2,1 m (7 ft.).
5. Rotate the Scissor Brace to a vertical position.
6. Lower the platform by pushing the Chassis Lift/Lower Switch to
the scissor brace is supporting the platform.
S
CISSOR
1. While holding the Brace, slowly raise the platform using the Chassis Controls until the end of the Scissor
Arm Weldment clears the Scissor Brace.
2. Rotate the Scissor Brace forward to rest on the Chassis.
3. Push the Chassis Lift/Lower Switch to
113100-020 - MX15 / MX19 - Operation Manual
T
E
H E
L E V A T I N G
B
I
RACE
NSTALLATION
B
S
RACE
TORAGE
!
Scissor Arm
Weldment
.
Brace
Installed
and ele-
Brace
Stowed
and completely lower the platform.

Maintenance

Figure 7: Scissor Brace
and gradually lower the platform until
Page 13

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Mx19

Inhaltsverzeichnis