Herunterladen Inhalt Inhalt Diese Seite drucken

Description; Features; Installation; Overhead Rigging - EuroLite 51918630 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

DESCRIPTION

Features

Three-armed centre-piece with RGBW LEDs and Strobe
• Threefold multi-scanner with moving mirrors
• Scanner head equipped with 132 x 5 mm LED (red: 8 x 3, green: 12 x 3, blue: 12 x 3 and white: 12 x 3)
• Strobe equipped with 48 white 9 mm LEDs
• Strobe effect with adjustable speed (1-10 flashes/sec.) and brightness
• 2 or 10 DMX channels selectable for various applications
• Static colors
• Built-in program
• Motion macros
• Manual focuses
• Sound-controlled via built-in microphone
• Individuall PAN/TILT control for each scanner head
• DMX-controlled operation or stand-alone operation with Master/Slave function
• Comfortable addressing and setting via control board with LED display and four operating buttons
• Mounting bracket for installations on a truss
• Ready for connection with power cord and safety plug
• DMX control via every standard DMX controller

INSTALLATION

Overhead rigging

Please consider the EN 60598-2-17and the respective national standards during the installation!
The installation must only be carried out by an authorized dealer!
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
The device should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the device. If you lack these qualifications, do not attempt the installation yourself,

DANGER TO LIFE!

19/27
00065878, Version 1.0

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Led clw-100 flower effect

Inhaltsverzeichnis