Herunterladen Inhalt Inhalt Diese Seite drucken

Instructions For The Installation Of The Barrier - Tau Rpb Installationsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 40

4. INSTRUCTIONS FOR THE INSTALLATION OF THE BARRIER

Installation position
for LUXE-S
(directly attached
to the cabinet)
20-30 cm
Installation in the cabinet, without using the supplied bracket:
1. Drill an 18 mm hole on the barrier cabinet, on the side of the boom. Follow the quo-
ta before drilling (fig.2);
NOTICE: make sure that the moving parts, inside the barrier, do not interfere
with the radar cable, otherwise position it with a TOWER2F;
2. The hole must be drilled at a standard height of 70 cm;
- In case of heavy vehicles passing, the drilling must be done at 80 cm.
3. The distance between the radar and the boom must be 20-30 cm.
Installation in the cabinet, using the supplied bracket:
In case of installation with the supplied bracket, it will be possible to orient the radar
on the horizontal or vertical axis, depending on the fixing of the bracket.
In this case it will be possible to fix the bracket directly in the cabinet, paying attention
to the type of screws used: they must not touch the moving parts (they must be short).
Installation position
for LUXE-M and LUXE
(Attached to an
external column)
fig. 3
fig. 2
17
70 cm
Inhaltsverzeichnis
loading

Inhaltsverzeichnis