6 Assembly
6
Assembly
Only install and wire the tower oscillation monitor if it is disconnected from the
supply of electrical power.
On mounting the tower oscillation monitor ensure there is an electrically conductive
connection with as large a surface area as possible between the mounting plate
and the attachment surface.
y
90°
x
90°
z (g)
S
Hexagon socket head cap screw M8×20 DIN 912 V2A with spring washer and washer
(Lenord+Bauer order numbers VS 1221, VS 1228, VS 1219); tightening torque: 24 Nm
M
Mounting surface, horizontal
Acceleration due to gravity, vertical
Mounting error (measurement uncertainty)
XY
0
α
f
XY
Correct horizontal mounting position
0
XY
Incorrect mounting position
f
α
Error angle
f
The sensor's offset error is dependent on the mounting error and is on average 0.17 m/
2
s
per degree deviation from the horizontal in X and Y direction (α
α
= 2° in the X direction there would be a measuring accuracy of 0.35 m/s
f
40
S
M
g
Lenord + Bauer
S
). At error angle e.g.
f
2
.
GEL 3011