10 Commissioning
Corrosive chemicals!
▶ Risk of caustic burns
Wear appropriate protective gear.
●
Completely drain the plant.
●
Leakage
▶ Emission of dangerous materials.
Provide precautionary measures against exceeding the
●
maximum permitted pressures caused by pressure
surges (water hammer).
1. Check the tightness and the function of the product (close
and reopen the product).
2. Flush the piping system of new plant and following repair
work (the product must be fully open).
ð Harmful foreign matter has been removed.
ð The product is ready for use.
3. Commission the product.