Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Of The Control Unit In The Outdoor Cabinet M - Graf One2Clean Einbauanleitung

Mehrbehälteranlage, rüstsatz 7 ew / 10 ew / 14 ew / 18 ew
Vorschau ausblenden Andere Handbücher für one2clean:
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

7. Installation of the control unit in the outdoor cabinet M

7. Installation of the control unit in the outdoor cabinet M
1.
Install the external control cabinet as described in
the installation instructions and establish the elec-
trical connection.
3.
The control unit is attached using the screws,
washers and nuts supplied with the control cabi-
net.
5.
The additional air distributor is fitted as described
in 5.4 and 5.5.
mail@graf.info
www.graf.info
Recommendation, crossbeam not included in scope of supply
Before installing the control unit, the supplied
sponge rubber strip must be glued to the back.
Optional: Installation of the traverse set for outdoor
cabinet M, Art. No. 105190 (to be ordered sepa-
rately).
The compressor is placed on top of the control
unit. Use the rubber bracket for the air connection.
For the power connection, the compressor's con-
nector is plugged into the socket on the control
unit.
For information about starting up the wastewater
treatment system and setting the control unit, refer
to the operating logbook.
26 / 80
2.
4.
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

106854106855106856106857

Inhaltsverzeichnis