Herunterladen Inhalt Inhalt Diese Seite drucken

Scope Of Supply - Graf One2Clean Einbauanleitung

Mehrbehälteranlage, rüstsatz 7 ew / 10 ew / 14 ew / 18 ew
Vorschau ausblenden Andere Handbücher für one2clean:
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

1. Scope of supply

Airlift pump and suction pipe
socket
Pipes
Control unit
The following items are not included in the shipment:
Hoses to supply air from the control cabinet to the septic tanks. Air hoses (2 x 13 mm, 2 x 19 mm)
are needed.
The hoses can be ordered by the reel:
20-metre PVC hose, black, 13 x 3 mm
20-metre PVC hose, blue, 19 x 3 mm
20-metre PVC hose, transparent, 13 x 3 mm
Core drill Ø 124 mm. This can be purchased from Otto Graf GmbH using article number 202003.
Carat S septic tank and covers must be ordered separately.
mail@graf.info
www.graf.info
1. Scope of supply
Sampling unit
Excess sludge lifter
16 / 80
2 membrane tube diffuser
for 7 inhabitants,
4 membrane tube diffuser for
10-18 inhabitants
Accessories
934017
934020
934011
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

106854106855106856106857

Inhaltsverzeichnis