Uninstall the T-Nuts from the upper outside channel in the Left and Right Base Members where the
19
Ratchet Handles were installed.
20
Install the T-Nuts previously uninstalled in Step 19 into the top channel of the Base Members.
21
Reinstall the Bolts, Washers and End Caps previously uninstalled in Step 18.
Repeat
on Other
Side
17
PARTS:
• • NIL
PARTS:
• • 4 x T-Nuts
PARTS:
• • 2 x M8 45mm Bolts
• • 2 x M8 Washers
• • 2 x 40x80 End Caps