Herunterladen Diese Seite drucken

SolaX Power X3-IES4K Installationsanleitung Seite 142

Vorschau ausblenden Andere Handbücher für X3-IES4K:

Werbung

Two Towers
Take the installation procedure for six battery modules as an example.
As for the installation steps for the following figure,
please refer to the Steps 1~22 of the Wall Mounting
to install the left tower and refer to the Steps 1~15
for the installation procedure of the right tower.
Please leave at least 250~300 mm between the
two towers.
23
4 screws shall be tighten.
*Note: The side of the series box with "R"
shall be against the wall.
24
*Note: The cover that covers on the series box shall be installed after finishing wiring. As
for the installation procedure of the cover, please refer to the section of "Installation of
Cover".
136
M5 * 14
2.2-2.5 N·m

Werbung

loading