1Step Extraction Kit
This device allows for easy insertion and removal of the pressing units and peel
ejectors in just one step (Fig. 15).
Before installation remember to insert the Blade holder (9).
To install, line up the pressing units with the shafts and adjust their position while
sliding them in. Use the central knob to attach the device to the machine.
Note: To remove simply reverse the process.
Assembly of the 1Step Kit (Fig. 16)
a) Place the rear holder (22) on a surface. The metal ejector holders should be
face down.
b) Match up the lower and upper pressing units (4 and 5). Line up the circular
bases of the pressing units with the holes on the holder. Note that the faces of
the pressing units are different.
Ensure to mount them as shown in the figure.
d) Line up the protruding cones of the pressing units with the four circular
bushes on the front holder (21).
e) Join both holders with the plastic securing knob (15).
c) Turn the 1step kit 180º and line up the ejectors (7 and 12) with the ejector
holders, inserting the extractor blade into the seal of the lower pressing unit.
Ensure that both holders are inside the ejector channel as shown in image 4.
Disassembly of the 1Step Kit (Fig. 16)
c) From the position shown in image 4, pull the ejectors (7 and 12) sideways to
remove them from the metal holders.
a) Turn the kit 180º and unscrew the plastic securing knob (15), which is located
behind the pressing units and holds both metal holders (21 and 22).
b) Carefully pull the front holder (21).
c) Separate the lower pressing unit (4) and the upper pressing unit (5).
Note: To clean the unit, refer to the Cleaning section.