• The tube bending machine comes largely assembled, only the rollers and pump levers
need to be inserted.
• Open the outlet valve of the lift cylinder by turning it counterclockwise to release
pressure.
• Make sure that no air is trapped in the lifting cylinder before using the pipe bender.
Press the pin down until it is fully retracted into the lifting cylinder to remove all air.
• Continue to press on the upper part of the pin and close the bleed valve. If necessary,
repeat this process.
The SC2-RB16 pipe bender is supplied in two separate packages.
Ensure that the pipe bender is positioned on a stable, level surface. Make sure
you leave enough space around the appliance to be able to bend the pipe
safely and easily.
The hydraulic system must be bled before initial commissioning.
Remove excess air from the hydraulic system:
• Remove the oil filler plug (12).
• Close the shut-off and drain valve (8) and pump up the lifting cylinder (3) with slight
counterpressure.
• Then open the shut-off and drain valve and push the piston of the lifting cylinder
downwards.
• Repeat this process 2-3 times.
• Once these steps have been completed, the excess air should be removed from the
hydraulic system.
EN
V. 1.1
Assembly
Before commissioning
9