Herunterladen Diese Seite drucken

Bergstrom Integral Power II Montageanweisungen Seite 14

Vorschau ausblenden Andere Handbücher für Integral Power II:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 26
INTEGRAL POWER II
EN
5
Pass the cabling through the borehole (T)
5
made for this purpose in the roof (figure 1).
Position Integral Power (A) with (6) 13 mm
pieces of bushing, rubber washers and (6)
M6/100x40 screws (B) and nuts M6/100.
Important: Ensure sealtightness between the
!
unit and the ceiling in order to prevent any
water coming in.
5
A
B
Insert rubber washers to prevent water
6a
6a
M6/100 nut
passage.
Flat washer
Rubber washer
Unit base
Bushing
Vehicle roof
Flat washer
Screw M6/100
14

Werbung

loading

Diese Anleitung auch für:

1003714489