Herunterladen Diese Seite drucken

Huawei SUN2000-M2 Kurzanleitung Seite 21

Vorschau ausblenden Andere Handbücher für SUN2000-M2:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 30
6.3
Creating a PV Plant and a Plant Owner
Setting the Physical Layout of Smart PV Optimizers
6.4
If Smart PV Optimizers are configured for PV strings, ensure that the Smart PV Optimizers have
been successfully connected to the solar inverter before performing the operations in this
section.
The PV strings connecting to the same MPPT route should contain the same number and
model of PV modules or Smart PV optimizers.
Check that the SN labels of Smart PV Optimizers are correctly attached to the physical layout
template.
Take and save a photo of the physical layout template. Place the template on a flat surface.
Keep your phone parallel to the template and take a photo in landscape mode. Ensure that the
four positioning points in the corners are in the frame. Ensure that each QR code is attached
within the frame.
For details about the physical layout of Smart PV Optimizers, see
xxx
Installer
20
To create multiple
installer accounts for a
company, log in to the
FusionSolar App and tap
Add User to create an
installer account.
In the quick settings, the grid
code is set to N/A by default
(automatic startup is not
supported). Set the grid code
based on the area where the
PV plant is located.
For details, see the
FusionSolar App Quick Guide
You can scan the QR code to
download the quick guide.
FusionSolar App Quick Guide
.
.

Werbung

loading