Herunterladen Diese Seite drucken

Fronius TU Podium Installationsanleitung Seite 18

Vorschau ausblenden Andere Handbücher für TU Podium:

Werbung

Installation
Screw the up-
right console to
the floor
Danger from falling devices.
This can result in severe personal injury and damage to property.
1
Mark drill holes
2
Screw the upright console to the subsurface with 16 screws
Screw two up-
Screw the upright consoles only as shown in the following diagram on the left.
right consoles
together
18
WARNING!
The mounting materials for screwing the upright console in place are not in-
cluded in the scope of supply for the upright console. The installer is respon-
sible for selecting the proper mounting materials.

Werbung

loading