Herunterladen Inhalt Inhalt Diese Seite drucken

MasterCool COMMANDER1100 Bedienungsanleitung Seite 22

R134a aufbereitung/recycling/aufladen
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 27
4.
Open the blue and red valves on the machine. Press next to start the process.
NOTE: Each step in the reclamation process will be displayed with individual progress screens.
Automatic Recovery
The following will be displayed:
Amount of refrigerant being recovered; numerically and in the tank graphic
Tank temperature and pressure
Amount of waste oil recovered
Vehicle pressure
Total weight of refrigerant in tank
Progress procession graphic on the left of all screens
Automatic Vacuum/Leak Test
The COMMANDER default is a 10 minute vacuum/leak test. The vacuum pump will run for 8 minutes pause for 2
minute leak test and resume for an additional 2 minutes of vacuum.
The following will be displayed:
22
COMMANDER2100 screen
www.mastercool.com
Inhaltsverzeichnis
loading

Inhaltsverzeichnis