Start-up
- Once the power supply unit has been connected, all the segments on the display
will be tested briefl y (all segments displayed).
- A short beep will then be heard and the version numbers of the weather station will
appear on the display.
- Next, the inside temperature and humidity values are displayed, along with the
barometric pressure. The corresponding sensors are built into the base station.
- The external sensors now have to be started up.
8. Finally, insert the clips on the
cover into the corresponding
notches on the cable channel
(see detail photo above), swivel it
upwards and latch it in at the top
(see photo below).
51