Herunterladen Diese Seite drucken

Miele PDR 914 HP Kurzgebrauchsanweisung Seite 148

Gewerbliche trockner
Vorschau ausblenden Andere Handbücher für PDR 914 HP:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
en - Installation
148
Position the tumble dryer in front of the heat-pump air openings.
Align the tumble dryer and heat-pump above the machine feet hori-
zontally and parallel to one another.
Tilt the heat-pump backwards slightly and move the tumble dryer
towards the heat-pump until the lower clamping lug on the heat-
pump is above the lower bevelled edge on the tumble dryer.
Now carefully tilt the heat-pump forwards again so that the clamp-
ing lug hooks in behind the bevelled edge on the tumble dryer.
Tumble dryer
a
Heat-pump
b

Werbung

loading

Diese Anleitung auch für:

Pdr 918 hpPdr 922 hp