Herunterladen Diese Seite drucken

BWT Bewamat 25A Einbau- Und Bedienungsanleitung Seite 43

Vorschau ausblenden Andere Handbücher für Bewamat 25A:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

SEt
Time
4688 L
4688 L
e.g.
3750 L
3750 L
8.3
Setting the supply of softened
water
The unit is preset to an:
Inlet water hardness of 20 °d
Blended water hardness of 4 °d
The supply of softened water is set if
– the capacity of the unit is changed
– another inlet water hardness is present
– another blended water hardness is desired
Calculating the supply of softened water:
Supply of softened water = ————————
in litres
K
for Bewamat 25 A
K
for Bewamat 75 A
E
= Inlet water hardness in °d
V
= desired and set blended
water hardness in °d
Press Cange Mode button
Display indicates SEt
Display flashes
Set the calculated soft-water supply
The new supply of softened water is not displayed
until after the next regeneration.
Press Change Mode button to end programming
EN
K x 1000
E - V
= 25 m
x °d
3
= 75 m
x °d
3
43
43

Werbung

loading

Diese Anleitung auch für:

Bewamat 75a