Herunterladen Diese Seite drucken

BWT Bewamat 25A Einbau- Und Bedienungsanleitung Seite 39

Vorschau ausblenden Andere Handbücher für Bewamat 25A:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
Firmly attach the flushing water hose into the
flushing-water connection (9).
Route the flushing water hose at an incline to the
sewage system connection (drain) and secure the
end with the supplied fixing material to prevent it
moving around when under pressure.
Put the overflow hose (18 x 24) on the overflow
(10). Secure it with cable ties and route it with an
incline of at least 10 cm to the sewage system
9
connection (drain).
10
6.1
Installation diagram
Water-
Dosing-
Filter
stop
unit
Floor-
Sewage
sensor
drain
Connect the unit as shown in the installation dia-
gram. The flushing water and overflow hoses may
not be connected or restricted.
> 20 mm
The flushing water and overflow hoses must be
connected to the sewage water system at least
20 mm above the highest waste water level (unim-
peded drainage).
39
39

Werbung

loading

Diese Anleitung auch für:

Bewamat 75a