Herunterladen Diese Seite drucken

Mankenberg RP 824 Originalbetriebsanleitung Seite 21

Vorschau ausblenden Andere Handbücher für RP 824:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Original operating manual
pilot-operated pressure regulators RP 824
13 Maintenance
DANGER
Danger of severe or fatal injury or damage to the interior of the piping system and
valve
During maintenance work (except for visual inspections), observe the respective notes and
warning notices in the section Troubleshooting help.
The self-acting function of the valve requires maintenance to ensure that it continues to operate perfectly. It is
important for maintenance workto take place in a planned manner and periodic intervals.
The maintenance plan is a recommendation by the manufacturer Mankenberg, which should be supplemented
by practical experience gained by the operator under the prevailing operating conditions.
Mankenberg shall assume no liability for damages resulting from improper maintenance and/or repairs.
The following information are required to order spare parts and maintenance kits:
Factory number, e.g. 19XXXX-3, or article number and order number
Sample plan for maintenance work
Type of maintenance
Check function
Check the
leaktightness of the
body, pipe connection
and sense lines
If installed upstream of
the valve:
Cleaning the strainer
Preventive
maintenance
Check the safety valve
1)
See comment at the beginning of this section: These time intervals are guideline values, these must be
adjusted depending on the prevailing operating conditions, the properties of the medium in the system and the
experiences of the user.
2)
Beware of crushing hazard: Take valve out of operation for cleaning!
3)
Request maintenance kit and replacement instructions from Mankenberg.
When restarting a previously dismantled valve, you must check the valve for leaktightness and proper function
as well as the actuators and functional components for correct calibration!
RP 824-4.X.231 Issue 17.11.2023
Work to be done
Check whether proper function is achieved in accordance
with the Intended use section
Visual inspection
In accordance with the manufacturer's instructions
Disassemble the valve; see Troubleshooting help.
Visual inspection of diaphragm and functional components
Replace all parts of the maintenance kit 3)
In accordance with the manufacturer's instructions
21
1)
Period
at least 1 x per
week
at least 1 x per
month
Depends on the
contamination level
of the medium
at least 1 x per
year
at least 1 x per
year
www.mankenberg.com

Werbung

loading