6.0 Commissioning SunPower Drive
6.1. Safety instructions before commissioning
•
Please make sure that the charging station is correctly connected to the power supply.
•
Please make sure that the charging station is installed as required.
•
Please make sure that the charging station is powered-on during the commissioning
process.
•
Check whether the charging connector is twisted and whether cables, plugs and housings
are in good condition.
© 2023 Maxeon Solar Technologies, Ltd. All rights reserved. | 549549 Revision A - October 2023
Specifications included in this document are subject to change without notice
20