Herunterladen Diese Seite drucken

SunPower Drive Serie Bedienungsanleitung Seite 20

Werbung

5.4. Post-installation inspection
5.4.1. Inspection
1.
Check that the base is secure and sealed.
2. Check that the internal components of the equipment are securely fastened.
3. Check that the electrical connections and wiring are correct and complete, that the connec-
tions are secure, and that the grounding is reliable.
4. Check that the degree of protection of the equipment meets the requirements, especially at
the cable entry at the bottom of the charger.
5. View appearance, marking, integrity, cleanliness.
© 2023 Maxeon Solar Technologies, Ltd. All rights reserved. | 549549 Revision A - October 2023
Specifications included in this document are subject to change without notice
19

Werbung

loading