Instruction Manual PCR Workstation Pro
CONNECTIONS
AC Power inlet
AC power switch
AC power inlet
Fuse
Before the first use, ensure that the voltage requirements of the PCR Workstation Pro exactly
match your local AC power supply. Connect the PCR Workstation Pro to the AC power supply only
by the AC power cord delivered with your PCR Workstation Pro. Only connect the PCR Work-
station Pro to electric power systems with an earth conductor. The AC power inlet and the AC
power switch are located at the rear side of the workstation. The AC power switch serves as dis-
connection of the AC power supply from the device. The accessibility of the AC power switch must
be assured and not hindered.
The electric fuse is placed at the back of the device between the power switch and the AC power
inlet. After pulling off the AC power cord and pushing upwards a safety catch, the fuse can be
changed. Use only a fuse with correct values (see "SPECIFICATIONS", page 8). Indications about
the fuse type are also located at the back of the device.
If service is required, contact your local distributor or the manufacturer (see "TECHNICAL SER-
VICE AND ORDER INFORMATION", page 22).
The serial number of the PCR Workstation Pro is located at the rear side of the instrument. The
replacement of single components of the device (except polycarbonate panels, UV tubes, fuse and
filter of the UV Air Recirculator) must not be done by the user but exclusively by authorized special-
ists using original replacement parts. Therefore the device must be sent to the manufacturer. Un-
authorized work on the device voids the warranty.
The surface of the device should be decontaminated with a lint free cloth soaked with 70 %
ethanol before sending. Please fill in and sign the decontamination certificate and send it to
the manufacturer together with the device.
For safety reasons the device must be switched off and the mains plug pulled before clean-
ing is performed!
PEQLAB_v1116_E
11