Herunterladen Diese Seite drucken

Endress+Hauser SFG500 Schnelleinstieg Seite 8

Fieldgate
Vorschau ausblenden Andere Handbücher für SFG500:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3. Check that there is sufficient clearance when e.g. a connector
4
1
4. Check the position of the DIN rail
– Fieldgate SFG500 requires no lateral clearance between modules and can be
mounted directly against any other non-Ex module
– To ensure adequate ventilation and prevent overheating, there must be
50 mm (2") lateral and vertical clearance between modules and the cabinet
ducting or wall
mm (inch)
6
107 (4.2")
116 (4.6")
p
(not supplied)
Power
PB DP
RS485
Power
Run
PB Err
LAN 1
Run
Failure
LAN 2
Failure
Reset
SFG500
SFG500
70 (2.8")
50 (2")
PB DP
RS485
Power
PB DP
PB Err
LAN 1
Run
PB Err
LAN 2
Failure
Reset
Reset
SFG500
70 (2.8")
70 (2.8")
o
is used
3
RS485
LAN 1
LAN 2
4
Endress+Hauser

Werbung

loading

Diese Anleitung auch für:

Sfm500Fieldgate sfg500Fieldgate sfm500