Herunterladen Diese Seite drucken

Hitachi RPC-1.5FSR Installations- Und Betriebshandbuch Seite 57

Vorschau ausblenden Andere Handbücher für RPC-1.5FSR:

Werbung

REFRIGERANT PIPING WORK
13 REFRIGERANT PIPING WORK
For the refrigerant piping work, vacuum pump and refrigerant charge, the details shall be referred to Installation and Operation
Manual of the outdoor unit.
13.1 PIPING MATERIALS
1 The tolerance of refrigerant piping length differs depending
on the combination with the outdoor unit. The details shall be
referred to Installation and Operation Manual of the outdoor
unit.
2 Select the piping size from the following table.
Model
RPC-1.5FSR
RPC-2.0FSR
RPC-(2.5-6.0)FSR
3 Prepare field-supplied copper pipes.
4 Select clean copper pipes. Make sure there is no dust and
moisture inside.
When installing pipe through the wall,
secure a cap at the end of the pipe.
Correct
Hole
Hole
Attach a cap or
vinyl tape.
17
PMML0551 rev.1 - 02/2021 - A10762310A
Unit: mm
Gas piping
Liquid piping
Ø12.7 (1/2)
Ø6.35 (1/4)
Ø15.88 (5/8)
Ø6.35 (1/4)
Ø15.88 (5/8)
Ø9.52 (3/8)
Do not place the pipe directly on the
Correct
Incorrect
5 As the new refrigerant (R410A) is adopted, the refrigerant
oil has been also changed, which tends to be affected by
foreign matters such as moisture, oxide film, fat. Perform the
installation work with care not to enter moisture, dust or old
refrigerant into the refrigerant cycle, otherwise the parts such
as expansion valve bite foreign matter and the operation
may be unavailable.
6 Use a pipe cutter to avoid a grind swarf generation for the
pipe cutting work. (Do not use a saw or a grind stone to cut
pipes.) Blow the inside of the pipes with nitrogen or dry air,
to remove any dust or foreign materials before connecting
pipes.
ground.
Incorrect
Attach a cap or
vinyl tape.
Correct
Incorrect
Rain water
can enter.
Attach a cap or vinyl bag
with rubber band.

Werbung

loading

Diese Anleitung auch für:

Rpc-6.0fsr