Herunterladen Diese Seite drucken

Hitachi CH-12.0NE Installations- Und Betriebshandbuch Seite 16

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39
10
REFRIGERANT PIPING WORK
4.4.3. Adjusting of the Unit Level
How to put Nuts
In order to avoid an incorrect unit operation, check the level of the unit using a water level in a
transparent Vinyl tube containing water.
Tighten the bolts of the suspension nuts with the suspension brackets after adjustment is completed.
Special plastic paint must be applied to the bolts in order to prevent them from loosening.
5.
REFRIGERANT PIPING WORK
DANGER:
Use refrigerant R410A in the refrigerant cycle. Do not charge oxygen, acetylene or other
flammable and poisonous gases into the refrigerant cycle when performing a leakage test or
an air-tight test. These types of gases are extremely dangerous and can cause an explosion. It
is recommended that compressed air, nitrogen or refrigerant be used for these types of tests.
5.1. PIPING MATERIALS
1. Prepare locally-supplied copper pipes.
2. Select clean copper pipes. Make sure there is no dust and moisture inside. Before connecting
pipes, blow the inside of the pipes with nitrogen or dry air, to remove any dust or foreign
materials.
3. Select the piping size from dimensional drawing
5.2. PIPING CONNECTION
1. Position of piping connection is shown in dimensional drawing.
2. Connect the accessories as shown in the Diagram bellow:
CH-(4.0/8.0)NE
{
To
Indoor
Unit
No
Description
Vinyl Tube
Level Scale
No
Pipe Fixing Band
}
To
Liquid Pipe
Outdoor
Unit
Low Gas Pipe
High Gas Pipe
Gas Pipe
Reducer
Field-Supplied Piping
Description

Werbung

loading

Diese Anleitung auch für:

Ch-8.0neCh-4.0ne