TEST RUN
16 TEST RUN
Test run should be performed according to this manual and
Installation and Operation Manual of the outdoor unit.
Do not operate the system until all the check points have been
cleared.
!
D A N G E R
Check to ensure that the electrical resistance is more than 1
megohm, by measuring the resistance between ground and the
terminal of the electrical parts. If not, do not operate the system
until the electrical leakage is found and repaired.
Do not touch any of the parts at the discharge gas side by hand
while the system is running, since the compressor chamber and
the pipes at the discharge side are heated higher than 90ºC.
16.1 BEFORE TEST RUN
Recheck that there is not any problems to the installation, and
do not perform the test run until all the following checking points
have been cleared.
1 Check to ensure that the refrigerant piping and the transition
wiring are connected to the same refrigerant cycle system.
If not, it will cause an abnormal operation and breakage of
instruments.
2 Do not apply the high voltage to the terminals for the
transmission (TB2 (A, B, 1 and 2)).
16.2 START TEST RUN
After the installation work is completed, test run should be
performed.
1 Check to ensure that stop valves (gas and liquid) of the
outdoor unit are fully opened.
2 In the case that indoor units are connected to the VRF
system, perform the test run of the indoor unit one by one
17 MAIN SAFETY AND CONTROL DEVICES
Model
For Evaporator Fan Motor
Internal Thermostat
For Control Circuit
Fuse capacity
Freeze Protection
Thermostat
Thermostat
Differential
30
PMML0551 rev.1 - 02/2021 - A10762310A
Cut-Out
C
o
Cut-in
ºC
A
Cut-Out
C
o
Cut-In
C
o
C
o
?
N O T E
Check to ensure that the stop valves of the outdoor unit are fully
opened, and then start the system.
Check to ensure that the switch on the main power source has
been ON for more than 12 hours, to warm the compressor oil by the
crankcase heater.
3 Check to ensure that each wire is correctly connected at
the phase of power source. If incorrectly connected, the unit
will not operate and the remote control switch will indicate
the alarm code "05". In this case, check the phase of the
primary power source according to the attached attention
label on the rear side of the service cover. Then, perform
the reconnection work correctly with turning OFF the power
supply.
4 Check to ensure that the main power source has been
turned ON for more than 12 hours, to warm the compressor
oil by the crankcase heater.
sequentially and then check accordance of the refrigerant
piping system and the electrical wiring system. (If the
multiple indoor units are operated simultaneously, the system
can not be inspected the system accordance.).
3 Perform the test run according to the "Installation and
Operation Manual" of remote control.
RPC-(1.5-6.0)FSR
Automatic Reset, Non-Adjustable
100
+15
100
+15
5
0
11
2
-10
-10