Operation and configuration of packaged units

Configuration
The cost calculated for each indoor unit is based on tariffs specified on the CSNET Manager.
There are two different systems to define the source of the consumed energy:
Use configured power meter devices data: in case of having power meter devices related to the units, the energy consumed
per each indoor unit will be calculated based on the information provided by these devices.
Enter the system consumption on the data period: in case of entering manually the consumption of the system in the desired
period, user enters the input reading data at the beginning and at the end of the period.
Current currency can also be specified.
The tariff table lets the user to set different time periods within a day with a related cost.
?
N O T E
The unit of measurement of the cost of a tariff period is the same than the input data reading. In case of using power meter device, the unit of
measurement should be the same than the specified on the power meter device configuration.