6 Pre-use Checks and Periodic
Examination
Table 3 Pre-Use Checks
Pre-use
Method
Checks
Load
Ensure load indicator has not been deployed (Figure 1).
Indicator
Examination
Ensure date of next examination has not elapsed.
Date
General
Where possible visually examine for signs of excessive damage, wear, corrosion or
Condition
contamination both outside and within the case.
Connectors
Check all visible cable for any signs of corrosion, excessive damage or contamination.
and visible
Ensure correct operation of connectors.
cable
Inspect line extraction and retraction by pulling out the entire length of line and letting it
Extraction/
retract back into the housing in a controlled manner. The line operation shall be smooth and
retraction
unhesitant (maintain a light tension on the lifeline whilst it retracts). Repeat three times.
Lock-on
Pull sharply on the lifeline and ensure device locks. Repeat three times.
Figure 1 Load Indicator
Table 4 Periodic Examination Interval
Usage
Infrequent to light
Moderate to heavy
Severe to continuous
The V-TEC SRL shall not be altered or added to and shall be repaired in accordance with the manufacturer's
instructions. Repairs shall be completed by a technician.
6.1
Maximum Product Life
The V-TEC SRL's service life is determined by the device condition as prescribed by pre-use checks and
periodic examinations; there is no fixed service life. Continued use is dependent upon passing pre-use
checks and periodic examinations. Service life may be reduced by frequency and conditions of use or local
regulations.
Interval
Annually (12 months)
Semi-annually to annually (6-12 months)
Quarterly to semi-annually (3-6 months)
V-TEC SRL
GB
9