Herunterladen Inhalt Inhalt Diese Seite drucken

Number Of Ventilation Units; Mounting Preparations; Mounting Information - Maico PP 45 RHL Montageanleitung

Vorschau ausblenden Andere Handbücher für PP 45 RHL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7.3 Number of ventilation units

Combinations
Ventilation units
PP 45 O/K +
room air control
RLS 45 O/K
Up to 3 additional
RLS 45 K permitted
Ventilation units
PP 45 O/K +
power unit RLS 45 LT
Up to 3 PP 45 LT per-
mitted
PP 45 RC units
(wireless)
Ventilation units
PPB 30 O +
room air control
RLS 45 O
Ventilation units
PPB 30 K +
room air control
RLS 45 K or
power unit PP 45 LT
* Can be used as a stand-alone unit with an
external wall air opening (ALD) for volumetric
flow compensation.
Number of ventilation
units
Max. 6 PP 45 units
(3 x 2 unit pairs).
From star point, 25 m
cable connection length
to PP45 unit. Up to star
point, max. 4 m.
Max. 6 PP 45 units
(3 x 2 unit pairs)
per power unit.
From star point, 25 m
cable connection length
to power unit. Up to star
point, max. 4 m.
Only operate PP 45 RC
devices in pairs,
any number of pairs*.
Observe ranges.
3 PPB 30 O or
2 PPB 30 O +
2 PP 45 O/K or
1 PPB 30 O +
4 PP 45 O/K
Set up unit pairs for
PP 45 units, if possible.
From star point, 25 m
cable connection length
to PPB 30-/PP 45 unit.
Up to star point, max.
4 m.
3 PPB 30 K or
2 PPB 30 K +
2 PP 45 O/K or
1 PPB 30 K +
4 PP 45 O/K
Set up unit pairs for
PP 45 units, if possible.
From star point, 25 m
cable connection length
to power unit. Up to star
point, max. 4 m.
8 Mounting preparations | UK

8 Mounting preparations

8.1 Mounting information

● PP 45 units are only suited for supply air
rooms.
● PPB 30 units are the ideal choice for
exhaust air rooms.
● Observe minimum spacing.
● Ensure sufficient space to work in front of
the unit  for filter change.
● The customer should provide appropriate
mounting material for mounting the wall
sleeve and external cover.
● Core hole diameter
condensate is removed via the external cov-
er, the core drill hole should have a 1 to 2 %
incline to the external wall. The condensate
is drained via the external cover. Recom-
mendation: To prevent dirt from depositing
on the façade around the external cover, fit
a water-repellent plaster system.
● Wall thickness PP 45 min. 265 mm,
wall thickness PPB 30 min. 320 mm.
● PPB 30: The slide-in unit (slide-in module
+ extension duct) must be appropriate for
the wall thickness to avoid a ventilation
short-circuit (lack of air). To ensure this,
shorten the extension duct accurately.
● PPB 30: With wall thicknesses of 500 to
790 mm, use the optional PP 45 VS exten-
sion kit. When installing, use the centring
ring provided for the extension.
● Observe permissible ranges for radio-con-
trolled units  Technical data PP 45.
● Select installation position so as to avoid
contamination and draughts.
● Only connect PP 45 O/K devices to power
modules PP 45 LT.
● In case of thin walls, use the compensating
frame PPB 30 ARE (stainless steel) or PPB
30 ARW (white). This frame can be screwed
to the wall with the fixing plate PPB 30 ARE
BB or PPB 30 ARW BB. Compensating
frames (depth 55 mm) are stackable. Only
use stainless steel screws when mounting
compensating frames made of stainless steel.
162. To ensure that
Ø
27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis