Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance Schedule - Scheppach IGT1500 Originalbetriebsanleitung

Inverter stromerzeuger
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

15. Maintenance schedule

Please adhere to the following maintenance periods in order to ensure a failure-free operation.
IMPORTANT! The equipment must be filled with engine oil and fuel before it is started.
Before each
use
Checking the en-
gine oil
Changing the en-
gine oil
Checking the air
filter
Cleaning the air
filter
Cleaning the petrol
filter
Visual inspection of
the equipment
Cleaning the spark
plug
Checking andread-
justing the throttle
vale on the carbu-
retor
Cleaning the cylin-
der head
Set the valve play
Important: The positions marked with "x*" should only be carried out by an authorized dealer.
After an oper-
ating period of
20 hours
X
For the first
time, then
every 50 hours
X
X
www.scheppach.com
After an
After an oper-
operating
ating period of
period of 50
100 hours
hours
X
X
X
Distance:
0.6 mm,
replace if
necessary
After an
operating
period of
300 hours
Change
the filter
insert if
necessary
X*
X*
X*
GB | 35

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

5806203986

Inhaltsverzeichnis