Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Important Notes; Spare Parts; General Maintenance Activities - HellermannTyton Autotool CPK hybrid Automatisierungsanleitung

Vorschau ausblenden Andere Handbücher für Autotool CPK hybrid:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6

Maintenance

6 .1

Important notes

Regular servicing is essential in order to ensure that the tool
remains in safe working order (see the maintenance schedule
in the Operating instructions for the tool).
CAUTION
Crush hazard when jaws close
f Do not insert fingers between upper and lower
jaws.
f Do not keep fingers on the trigger.
f Always keep the power pack switched OFF while
servicing is in progress.
6 .2

Spare parts

Spare parts and accessories can be ordered directly from
your HellermannTyton national representative,
à website
www.HellermannTyton.de.
6 .3

General maintenance activities

The operations involved in servicing the tool and the power
pack are described in the Operating instructions for the tool
(see the "Servicing" section in the Operating instructions for
the tool).
f Check the tool and the accessories regularly to make
sure that everything is in full working order.
f Dispose of waste material at regular intervals.
f Check the compressed-air lines for leaks (see the
operating instruction for the compressed-air equipment).
The compressed-air equipment is not included in the scope
of supply.
f Replace faulty compressed-air lines immediately.
f Check electrical wiring for damage.
f Replace faulty wires immediately.
CPK_hybrid_Automation_instructions_106-29009_V01_01.2023
Maintenance
11

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

106-60000

Inhaltsverzeichnis