Herunterladen Inhalt Inhalt Diese Seite drucken

Kemper SparkTrap Betriebsanleitung Seite 57

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
Item
Description
A
Continuous earthing connection of the piping parts with drill
head screws
B
Central earthing point of the pre-separator
C
Local earthing point/equipotential bonding rail
The earthing cable is connected as follows:
1. Fasten the earthing cables (item 1 + 2) with drill head screws according
to the illustration.
2. Connect the earthing cable (item 3) to the central earthing point of the
product (item B).
3. Connect the central earthing point (item B) on the dust collection
bucket to the local earthing network/equipotential bonding rail (item C).
4. After installing the earthing cables, check the earth resistance with a
continuity tester.
1502021-01
Tab. 16: Earth connection
- 57 -
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis