Herunterladen Inhalt Inhalt Diese Seite drucken

Hinges/ Bearings; Measures After Completed Maintenance Work - Novoferm NovoDock L100 Original-Montage- Und Betriebsanleitung

Ladebrücke
Vorschau ausblenden Andere Handbücher für NovoDock L100:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
8.5

Hinges/ bearings

Lubricate the bearings on the dock leveller platform and on the hinged lip through the tapered holes with multi-
purpose grease (see arrows).
Fig. 4: Lubrication points, illustration may deviate from the product
8.6
Measures after completed maintenance
work
Put the dock leveller into rest position immediately
after use.
After a successful test run, the dock leveller is ready
for operation.
These assembly, operation and maintenance instructions must be kept for the entire period of use!
EN - 29

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis