Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

MAINTENANCE

Make sure that the machine is not live when
carrying out maintenance work on the motor.
-
To ensure good performance, check and clean the
suction and detergent filters after every 50 hours of
operation. FIG.6A
-
Long periods of disuse may lead to the formation of
lime scale deposits. Working through the hole on the
rear, RELEASE the motor using a screwdriver (for
models with this feature). FIG.6B
-
Then remove the screwdriver and proceed with the
restart operations.
-
Clean the nozzle with the tool provided. Remove the
lance from the gun (FIG.6C), remove any dirt from
the nozzle hole (FIG.6D) and rinse.
Cleaning
Keep the ventilation slots of the machine clean to
prevent overheating of the engine.
Regularly clean the machine housing with a soft cloth,
preferably after each use. Keep the ventilation slots free
from dust and dirt.
If the dirt does not come off use a soft cloth moistened
with soapy water. Never use solvents such as petrol,
alcohol, ammonia water, etc. These solvents may
damage the plastic parts.
Lubrication
The machine requires no additional lubrication.
Faults
Should a fault occur, e.g. after wear of a part, please
contact your local Ferm dealer.
In the back of this manual you find an exploded view
showing the parts that can be ordered.
ENVIRONMENT
In order to prevent the machine from damage during
transport, it is delivered in a sturdy packaging. Most of
the packaging materials can be recycled. Take these
materials to the appropriate recycling locations.
Take your unwanted machines to your local Ferm-
dealer. Here they will be disposed of in an
environmentally safe way.
GUARANTEE
The guarantee conditions can be found on the separately
enclosed guarantee card.
8
ı
( UK )
CE
DECLARATION OF CONFORMITY
We declare under our sole responsibility that this
product is in conformity with the following
standards or standardized documents
EN 60335-2-79: 1998
in accordance with the regulations.
98/37/CE
CEE 73/23, CEE 89/336
from 01-11-2002
GENEMUIDEN NL
W. Kamphof
Quality department
:
,
.
.
,
,
.
.
.
,
.
1,5 mm2.
.
1.
,
.
2.
.
3.
Ferm
Ferm
,
.
-
-
.
-
,
.
,
.
,
-
.
,
,
-
,
-
.
.
,
-
!
3 x 1,5 mm2.
-
-
.
-
.
-
,
-
.
.
-
-
,
.
.
,
.
.
.
,
.
.
(TSS),
1-2
.
.
,
,
,
.
"IPX5".
25
50
3 x 2,5 mm2.
.
,
.
.
,
,
,
3 .
.
.
.
.
89

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

328150

Inhaltsverzeichnis