Herunterladen Inhalt Inhalt Diese Seite drucken

Endress+Hauser iTEMP TMT125 Bedienungsanleitung Seite 32

Vorschau ausblenden Andere Handbücher für iTEMP TMT125:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Wiring
Handling the cable gland
Fig. 6: Handling the cable gland
Pos. A: Inside plastic part
Pos. B: O-Ring
1.
Insulate the covering of the cable up to about 120 mm (4.7").
2.
Loosen the cap nuts from the field housing and push it onto the cable.
3.
Remove the inside plastic part as well and push it onto the cable. Move the inside plastic
part far enough over the cable that the covering is completely surrounded. The covering
must not stand out over the end of the inside plastic part.
4.
Pull the shield over the inside plastic part and shorten it to the correct length. The shield
should protrude about 3 to 4 mm (0.12 to 0.16") beyond the O-ring.
5.
Insert the cable with the inside plastic part into the lower part of the cable gland.
6.
Then tighten the cap nut. The tightening torques of cap nuts depend on what type of cable
is used and must therefore be determined by the user. As rough guide → ä 31.
32
TMT125
T09-TMT125FF-04-xx-xx-xx-000
Endress+Hauser

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis