Herunterladen Inhalt Inhalt Diese Seite drucken

Pre-Operation Safety Inspection - Upright AB60JRT Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Pre-Operation Safety Inspection

Note
Carefully read, understand and follow all safety rules,
operating instructions, labels and National Safety Instruc-
tions/Requirements. Perform the following steps each
day before use.
1. Open the turntable covers and inspect for damage,
fluid leaks or missing parts.
2. Check the level of the hydraulic fluid with the plat-
form fully lowered. The fluid level must be between
the full and add marks as viewed on the sight glass.
Add recommended hydraulic fluid if necessary. See
"Specifications" on page 20.
AB60JRT
Pre-Operation Safety Inspection
3. Check that the fluid level in the batteries is correct.
See "Battery Maintenance" on page 15.
4. Check that all guardrails are in place and all fasteners
are properly tightened.
5. Inspect the machine thoroughly for cracked welds
and structural damage, loose or missing hardware,
hydraulic leaks, damaged control cable and loose
wire connections.
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis