Herunterladen Inhalt Inhalt Diese Seite drucken

Gemü Q50 eSyStep Betriebsanleitung Seite 92

Elektromotorisch betätigtes schlauchquetschventil
Vorschau ausblenden Andere Handbücher für Q50 eSyStep:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

13 Inspection and maintenance
13.2 Removing the tube
Risk of crushing!
▶ While the tube holder is open, the actu-
ator can move. Severe injury due to
crushing or shearing of the fingers.
Ensure that the actuator remains in the
open position during tube replace-
ment.
Do not reach into the tube crushing
area.
1. Move the actuator A to the open position.
2. Turn the locking ring b by 90° in the direction of the arrow.
ð The word "unlocked" can be read on the tube holder.
3. Open the tube holder 1.
4. Remove the tube.
13.3 Disassembling the tube holder
1. Remove the tube (see "Removing the tube", page 92).
GEMÜ Q50 eSyStep
CAUTION
b
1
2. Loosen the fixing screw c using an Allen key.
3. Remove the tube holder 1.
13.4 Disassembling the compressor
Risk of crushing due to the compressor
shutting down!
▶ Severe injury due to crushing or shear-
1. Remove the tube (see "Removing the tube", page 92).
2. Disassemble the tube holder (see "Disassembling the tube
holder", page 92).
3. Move the actuator A to the closed position.
4. Pull the compressor 2 out downwards.
92 / 100
1
c
CAUTION
ing of the fingers.
Ensure that the actuator remains in the
open position while replacing the com-
pressor.
Do not reach into the tube crushing
area.
2
www.gemu-group.com

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis