Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Assembly; Preconditions For Installation; Unpacking The Ro Device; Hydraulic Installation - BWT bestaqua 14ROC Coffee Einbau- Und Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für bestaqua 14ROC Coffee:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
It is a good idea to install a shut-off valve at the inlet side of the device, so that the feed wa-
 
 
ter supply can be interrupted for service purposes.
Installation on site should be executed in at least DN 10. If the feed is too small, there is a risk
 
 
of interrupted operation due to insufficient water pressure or insufficient flow rate, e.g. when
flushing the reverse osmosis membranes.
Installation of a pressure reducer can reduce the flow.
 
 

4 Installation and assembly

4.1

Preconditions for installation

A location that allows easy connection to the water supply should be selected for the device.
 
 
There should be a waste water connection and a separate electricity supply (100-230 V,
 
 
50 Hz) close by.
The device must be connected to a grounded plug socket. The electricity supply and re-
 
 
quired feed water pressure must be guaranteed at all times. The electromagnetic interfer-
ence (voltage peaks, high-frequency electro-magnetic fields, interference and voltage fluctu-
ations...) due to surrounding electrical installations must not exceed the maximum values stat-
ed in the standard EN 61000-6-4.
I
CAUTION!
Quality of the piping network: Only corrosion-resistant materials may be used in the permeate area.
f
Read the Technical Data (Kapitel 2) and Operating/Safety Information (Kapitel 4) before installation.
f

4.2 Unpacking the RO device

Remove your device from the packaging and check the delivery for completeness and any trans-
port damage.
I
CAUTION!
Defective parts must be replaced immediately.
f
Work tidily.
f

4.3 Hydraulic installation

I
CAUTION!
Only flexible hoses in accordance with DVGW W 543 may be used to connect the device.
f
When assembling with accessories (hoses, connections sets), please note the installation dimensions and bending radii.
f
The BWT bestaqua 14ROC Coffee shall be erected and operated with assembled magnetic
 
 
plates.
The hoses of the device shall be assembled without tension.
 
 
Check that the water connections have been connected in a leak-proof way.
 
 
The concentrate line shall be directed and attached to the on-site waste water connection.
 
 
The cross-section of the flexible hoses must not be narrowed. During assembly, ensure that
the concentrate and permeate lines are connected correctly.
NOTE!
Before the RO unit can be used, we recommend checking the water pre-treatment (e.g. in-house water softening systems, central water
f
treatment by the waterworks). This measure is necessary in order to increase the efficiency and life span of your RO membrane.
Please discard the permeate produced during the first approx. 10 minutes after each new installation / initial commissioning and after
f
each membrane replacement.
Any change in the temperature of +/- 1°C results in the permeate performance of the membranes increasing or reducing by approx. 3%.
f
Please also follow the operating instructions of the external pre-filter used.
f
We generally recommend operation with softened water, which increases the life span and operational safety of the reverse osmosis
f
membranes.
19

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis