4.5. Performing tests

The following tests must be performed by a certified electrical fitter.
WARNING!
The following tests must be performed with the power supply
switched on. There is a danger of electric shock.
● NEVER touch live parts.
1. Check the contact of the earth conductors on the earth conductor terminal.
2. Check the safety shut-off.
a. Switch on the control unit.
► The control light must be permanently on.
If the control light flashes, continue from point 5. Troubleshooting
for the installer.
WORLD OF WELLNESS
Heater sensor half-shells
1
Connection panel
2
Cross-head screws (9 mm)
3
Heater sensor
4
Heater sensor wires
5
Wood screws (16 mm)
6
p. 13/26